Marktentwicklung LNG

Since 19 May 2006, the percentage by mass of sulfur in the fuels to be burned must not exceed 1.5%.

Since 1 July 2010, only fuels with a sulfur content of 1.0% may be burned in SECAs.

Since 1 January 2015, only fuels with a sulfur content of 0.1% may be burned in SECAs.

From 2020, only fuels with a sulfur content of 0.5% may be burned outside the SECA zones.

Goto first page
Scroll up
Scroll left
Scroll right
Scroll down

Panama, Port of Colon

PANAMA, PORT OF COLON
TBC

Jacksonville - Talleyrand Marine Terminal

Tank-to-Ship
500,000 gallon storage tank and loading jetty

Shell US East Coast LNG Bunker Barge

4000 cum

LA/LONG BEACH

Tacoma

Tank-to-Ship
30,000 cum storage

Vancouver

Shore-to-Ship and Ship-to-Ship

Stolt Nielesen LNG Bunkering Vessel

7500 cum


Isle of Grain

TBC

ENGIE ZEEBRUGGE

5500 cum

Dunkerque

Ship-to-Ship

Le Havre

TBD

Bilbao

Ship-to-Ship
Bunkering vessel capacity of 600 cum


Algeciras

TBC

CORAL METHANE

7551 cum

Valencia

TBC


Barcelona

Truck-to-Ship; Ship-to-Ship
TBC

ZEEBRUGGE

Truck-to-Ship, Tank-to-Ship, Ship-to-Ship
TBD

CARDISSA

6500 cum

Amsterdam

Truck-to-Ship since 2013; Ship-to-Ship
TBD






Hammerfest (Polarbase)

Tank-to-Ship
90 tonnes/h

Stockholm

Tank-to-Ship, Ship-to-Ship
20,000 cum storage tank


Gothenburg

Ship-to-Ship

Klaipeda

Truck-to-Ship, Tank-to-Ship, Ship-to-Ship
5,000 cum storage

CORALIUS

5800 cum

Hamburg

Truck-to-Ship, Tank-to-Ship
5,500 cum storage

Antwerp

Truck-to-Ship
TBD

Marseille

Truck-to-Ship, Ship-to-Ship planned
TBD

Stolt-Nielsen LNG Bunkering Vessel

7500 cum

Fujairah

Starting with Ship-to-Ship transfers of LNG

Kochi

Tank-to-Ship
2 x 155,000 cum storage tanks

Incheon

Truck-to-Ship

Ulsan

Busan

Tank-to-Ship
TBC

Shanghai (Zhejiang Zhoushan)

Tank-to-Ship, Ship-to-Ship


Hong Kong

TBC

Singapore

Truck-to-Ship Plans for Ship-to-Ship by 2020

Yokohama

Truck-to-Ship,Plans for Ship-to-Ship by 2020
TBC

Chubu region

TBC

Vancouver

Truck-to-Ship
78 cum/hour delivery per truck; multiple truck capabilities


CLEAN JACKSONVILLE

2200 cum


BLUE LNG

7500 cum

SEAGAS

187 cum

FLEXFUELER001

760 cum initially, increasing to 1480 cum


SHELL ROTTERDAM LNG BUNKER BARGE

3000 cum


SHELL ROTTERDAM LNG BUNKER BARGE

3000 cum

GAS NATURAL FENOSA LNG BUNKER VESSEL

600 cum

GAS NATURAL FENOSA LNG BUNKER VESSEL

TBD

KOREA LINE LNG BUNKERING VESSEL

7500 cum

ENN LNG BUNKER VESSEL

8000 cum

FUELNG LNG BUNKER VESSEL

7500 cum

Goto first page

HEROSE GMBH
ARMATUREN UND METALLE

Elly-Heuss-Knapp-Strasse 12
23843 Bad Oldesloe
Germany
Telephone: +49 4531 / 509 - 0
Telefax: +49 4531 / 509 - 120
E-Mail: info[at]herose.com
Internet: www.herose.com

Managing Directors:
 
Dipl.-Jur. Dirk M. Zschalich,
MBE Dipl.-Ing. Eike Dölschner
District Court Luebeck, HRB 1517 OD

VAT Reg. No.
according to § 27 a Umsatzsteuergesetz: DE 118564125

Liability note:

Though carefully supervised we will not take any responsibility for the contents of external links. The responsibility for the contents bears exclusively to the providers of the linked pages.

Copyright 2018: HEROSE GMBH,
Bad Oldesloe
(All rights reserved, subject to errata and printing errors)

Data Protection Officer:

Mauß Datenschutz Bernhard-Nocht-Strasse 105 20359 Hamburg Germany
Telephone: +49 40 999 99 52-0
E-mail: info@dataprivacy.herose.com
Website: https://www.datenschutzbeauftragter-hamburg.de

Concept, design, realisation: gugelot gmbh, Hamburg

Goto first page

Goto first page

Ship-to-ship bunkering can take place along the quayside at anchor or at sea. The capacity of bunkering vessels can range from 150 to 10,000 m³. Ship-to-ship bunkering is suitable for all types of vessels and is expected to become the main bunkering method for ships with a bunker demand of over 100 m³.
Goto first page
Among the various methods for in-port bunkering of LNG-fuelled ships, truck-to-ship transfer is currently the most frequently used bunkering method. The LNG trailer is connected to the ship using a flexible hose. Today this is the most widely used bunkering method due to the limited demand in combination with the lack of infrastructure.
Goto first page
Another bunkering method is shore-to-ship, whereby LNG is either bunkered directly from a tank or small station, or from an import or export terminal. Normally piplines are used to connect the LNG terminal with the bunkering facility at the quay.
Goto first page

Filtration of the medium ensures compliance with the specified level of purity for downstream processes. For this various screens and filters with different mesh sizes are available.

Sizes: DN10 to DN200
Pressures: up to 50 bar (725 psi)
Temperatures: -196°C to +120°C
Connections: Butt weld, socket weld, welded stubs, threads, flanges
Material: Stainless steel
Goto first page

Anforderungen

Goto first page
Goto first page
Goto first page
Scroll up
Scroll left
Scroll right
Scroll down
Goto first page

Durchgangsventile

HEROSE globe valves are available with a wide range of connections and material combinations. They can be equipped with additional functions, such as bellows seals for increased tightness requirements, or with a non-return function. With this combination, use of a separate valve can be eliminated.

Sizes: DN10 to DN200
Pressures: up to 50 bar (725 psi)
Temperatures: -255°C to +120°C
Connections: Butt weld, socket weld, welded stubs, threads, flanges
Material: Stainless steel
Goto first page

Goto first page
Scroll up
Scroll left
Scroll right
Scroll down

Safety valves

Actuated valves

Globe valves

Strainer

Check valves

Goto first page

HEROSE safety valves are certified according to global standards, including CE and ASME. They can therefore be used throughout the world, regardless of where the customer later installs the equipment.

Sizes: DN6 to DN50
Pressures: 0.2 bar (3 psi) to 550 bar (7977 psi)
Temperatures: -270°C to +400°C
Connections: Threads, flanges
Material: Stainless steel

Goto first page

Services

HEROSE Service and maintenance portfolio

Fullscreen
Commission service
A team of service engineers is ready to assist you with installation guidance for the HEROSE product range.

Maintenance service preventative
We suggest to regularly conduct preventive maintenance checks of the installed equipment in order to avoid unexpected downtimes.

Maintenance service on demand
In case of any maintenance service our team of service engineers is ready for the next job.

Spare Parts
Major spare parts are available from stock and can be shipped within a short time.
Close
Goto first page

Angetriebene Armaturen

If required, HEROSE pneumatically actuated globe valves can be equipped with an additional hand wheel, with which the valve can be opened or closed manually in case of loss of pressure. Optional seawater-resistant materials are available, which are ideally suitable for offshore use.

Sizes: DN10 to DN200
Pressures: up to 50 bar (725 psi)
Temperatures: -196°C to +120°C
Connections: Butt weld, socket weld, threads, flanges
Material: Stainless steel
Goto first page

Referenzen


Cruise vessels

Hurtigruten
AIDA
Costa Crociere

Ferries
Bergensfjord
Stavangerfjord
Fjordline
Megastar (Tallink)
Spirit of British Columbia (BC Ferries)
Helgoland
Salish Orca, Eagle, Raven
Abel Matutes
Hasvik
Honfleur

Inland waterway shipping
Eiger
Greenstream
Greenrhine
Argonon

Bunkering vessels
Seagas
Coralius
Flex Fueler
Future Sardinia

Cargo and other vessels
Greenland (Cargo)
Ireland (Cargo)
Bergen Viking
Polaris (Icebreaker)
Hummel (LNG power barge)
Samuel de Champlain (dredger)
L´Ostrea (dredger)
Goto first page

Rückschlagventile

Check valves allow fluids or gases to flow through it in only one direction and prevent backflow of the medium.

Sizes: DN10 to DN200
Pressures: up to 50 bar (725 psi)
Temperatures: -196°C to +120°C
Connections: Butt weld, socket weld, welded stubs, threads, flanges
Material: Stainless steel
Goto first page

Anwendungen FGSS und Bunkerstationen

Goto first page

Heating Unit

Contains components to warm up the cold gas for the engine.

Bunkering Manifold

The connection for bunkering LNG.

LNG Storage Tank

All tanks are either double or single walled IMO Type-C tanks. They can be placed on deck or inside the hull.

Cold Box including Gas Processing Unit

It contains all piping, valves and equipment to source LNG from the storage tank and manage the tank pressure. The gas processing unit evaporates the LNG and supplies the gas to the consumer.


Goto first page
Goto first page

Foundry has to be certified as producer by the classification society.

Three tests during the casting process covering a tensile test, V-Notch Test at minus 196°C and chemical analysis of the material.

The tests are witnessed and certified with a 3.2 class certificate depending on classification society.
Goto first page
All pressure bearing parts are 100% hydrostatic tested at 1,5 time of the nominal pressure.

100% seat tightness test according to DIN12266 for all assembled valves.

100% external leakage and functional test before delivery.
Goto first page
Functional and tightness test of each type and size under cryogenic conditions.

Inner and external tightness test to at least 1.1 time of the design pressure under cryogenic conditions.

All tests can be witnessed by classification societies.
Goto first page
Welding bodies into the piping should always be done without installed topwork.

All sensitive valves parts like disc, seats and actuators should be protected and handled with care.

Hydrostatic testing of the complete system should be done with a clean medium to avoid damages of sealing surfaces.

You need assistance on commissioning? Please find out more under our service and maintenance portfolio.
Goto first page

Goto first page
Goto first page











Hintergrund-Video Blackpeach
Goto first page
Goto first page
Goto first page
Goto first page
Goto first page

Goto first page
Goto first page
Fjordline
Klassifizierungsgesellschaft:
Gelieferte Armaturen:

Tallink
Klassifizierungsgesellschaft:
Gelieferte Armaturen:

Honfleur
Klassifizierungsgesellschaft:
Gelieferte Armaturen:

Hastig
Klassifizierungsgesellschaft:
Gelieferte Armaturen:   

Spirit of British Columbia Klassifizierungsgesellschaft:
Gelieferte Armaturen:
Goto first page
Polaris
Klassifizierungsgesellschaft:
Gelieferte Armaturen:
Goto first page
AIDA NOVA
Klassifizierungsgesellschaft:
Gelieferte Armaturen:
Goto first page
Goto first page
Goto first page
Goto first page
Scroll down to continue Swipe to continue
Swipe to continue